
Growth and customer satisfaction at AiroGen come from consistent effort on quality improvement and product development. Our Kathwada facility combines modern manufacturing with disciplined testing before dispatch.
This article summarises what “factory tested” means in practice—not a sticker, but a repeatable process.
Incoming material control
Castings, motors, valves, and fasteners are verified against specifications. Rejecting substandard inputs upstream prevents expensive failures downstream.
Assembly discipline
Torque procedures, alignment checks, and cleanliness during build reduce vibration and oil leaks. Technicians follow documented work instructions for each model family.
No-load and loaded run tests
Units are exercised to verify pressure build, safety valve behaviour, unloading, and temperature rise. Anomalies are corrected before the product is cleared for packing.
Electrical and safety checks
Starters, overloads, and earthing are confirmed. Guards and warnings must meet our internal checklist before sign-off.
Paint and packaging
Corrosion protection and crate or pallet integrity matter for road transport across India. We pack to survive monsoon season handling where needed.
Records and traceability
Serial numbers link each unit to its test log and key components—essential for warranty support and continuous improvement feedback loops.
Innovation in design
Innovation in design and manufacturing techniques is our forte. Field data from service visits feeds back into the next revision of castings, piping, and controls.


